Skip to content

AS FEATURED

ON SWEETS

Phone: (715)327-4660 Email: info@d8products.com

HOME
SPECS
Resources
About
Brochures
SPECS
Quote Request
Contact
FAQ
Projects
Project Updates
Quote Request
Contact

Project Update: Beloit College Library Manufacturing

By SavannahIn Beloit College Library, UncategorizedPosted June 13, 2024
Canopy Hanging on Powder Coat Rack

We’re excited to announce the Beloit College project has moved on to the manufacturing stage, and the first canopy is being prepared for powder-coating! We’ve been honored to work with Corporate Contractors Inc throughout the process and look forward to installing our canopies!

Savannah

Savannah

Post navigation

Previous
Previous

D8 Products Open House

Next
Next

Project Update: Beloit College Powder Coat

Recent Posts

  • Infinity Warehouse Complete
  • Take 5 Oil Change
  • Project Update: Monument Warehouse Installation- Monument, CO
  • Project Update: Sac and Fox Trad’n Post Manufacturing
  • Project Update: Auto Repair Shop Remodel – St. Cloud, MN

Archives

  • June 2025
  • May 2025
  • January 2025
  • October 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024

Categories

  • Amery Wastewater Treatment Plant
  • Auto Repair Remodel – St. Cloud, MN
  • Beloit College Library
  • Blain's Farm & Fleet – Waukesha, WI
  • Keystone Retail Center
  • Monument Warehouse
  • Neenah Animal Shelter
  • Ripon College
  • Sac & Fox Trad'n Post
  • Uncategorized

409 S. Wisconsin Avenue

Frederic, WI 54837

Phone:  715-327-4660

Email: info@d8products.com

Facebook-f Instagram Linkedin-in Youtube

© Copyright 2025. All rights reserved